Treatment of aerobically stabilized sewage sludge from an activated sludge plant (“extended aeration”) – 13 000 p.e.

Client: Greve Municipality

Location: Mosede, Denmark

Established: 1999

Number of basins: 10

Sludge type: Activated sludge

Sludge volume: 1,000 tonnes DS/year

PE, amount: 60,000

 

Client: Skövde Municipality
Location: Skövde, Sweden
Established: 2003
Number of basins: 10
Sludge type: Activated sludge and digested sludge
Sludge volume: 1,200 Tonnes DS/year
PE, amount: 50,000

Aerated wetland at nursery home in Belgium

Aerated wetland 1,650 m² for treatment of fruit peeling company.

Intensified (aerated) wetland for wastewater treatment of 800 employees at the administrative center of a mining company, situated near Belo Horizonte, Brazil.

Conception: 2 Septic Tanks for pre-treatment, aerated wetland as main treatment and horizontal flow constructed wetland post treatment.  

Wetland project and execution by Rotária do Brasil, Landscaping only execution by Rotária do Brasil.

 

Peterborough: A 2,570m2 Horizontal sub-surface flow reed bed treating hydrocarbon loaded run-ff with peak flows of 1,420 m3/day.

A 11000 m2 artificial pond and 2600 m2 reed bed filters were created for the storage and treatment of stormwater and runoff from Servier pharmaceutical Laboratories site in Gidy. Designed to be able to treat once-a-century rainfall. Capacity : 12000 m3. Design : Epur Nature. Established : 2014.

Pond treatment system to prevent algae growth at Bebat Tienen (Belgium)

Segonzac wastewater treatment plant for domestic sewage - Capacity 1600 people equivalent. In the shape of snail, emblem of the village.  Design : Epur Nature. 2014