Wastewater treatment plant for 1250 p.e., in a very touristic site in the south of France, separative sewerage system, constructed in 1998.

“French sytem” treating raw unsettled sewage in a 2 stage vertical flow reed bed filter without electricity

Vertical flow constructed wetland treating the sanitary wastewater from the border control office at Kallo (Antwerp, Belgium)

Bezannes : a 8000 m² artificial pond plus 3500 m² of reed bed filters and 1600 m² of wetlands were created to treat stormwater runoff from a large non-residential area.

Aerated wetland for a hotel in Antwerp, Belgium

Crynant: Two 1,200m2 vertical flow reed beds operated alternately to treat 3,400 m3/d of tertiary municipal waste water.

Wetland to treat run-off from deicing operations contaminated with high concentrations of glycol compounds and capable of handling peak flows and loading from winter storms.

The two stage reed bed system at Aumont (500 PE), in the French Jura mountains meets stringent discharge standards in phosphorous removal through a third stage filtration with reactive media

1,2 ha system treating the effluent of an activated sludge system for treament of the liquid fraction of swine manure.