Saint Sulpice la Foret : a 1000 PE waste stabilization pond boosted to 1950 PE by addition of reed bed filters. A 2,400 m², vertical flow reed bed (French system), a 1,950 m² second stage vertical flow, unsaturated plus a 10,000 m² of willow plantation and a 5,000 m² pond treating 400 m3/d of domestic effluent.

Grenoble – urban park Ouagadougou: a 1 ha urban park with reed bed filters and surface flow wetlands collecting and treating stormwater runoff from the roofs of buildings and from adjacent roads in order to meet irrigation needs of the park and to reduce discharge of stormwater into the municipal sewer system. This project was the laureate of the NOVATECH 2013 international conference of sustainable urban drainage award http://novatech.graie.org/a_present_laureats.php

 

 

One stage of reed beds fed with raw sewage assures primary and secondary treatment for 1200 People Equivalent, followed by a trickling filter for polishing and nitrification. A tertiary UV treatment enables a pathogens removal by 4 U log.

Bezannes : a 8000 m² artificial pond plus 3500 m² of reed bed filters and 1600 m² of wetlands were created to treat stormwater runoff from a large non-residential area.

Aerated wetland treating waste water from a small cheesery and dairy farm

Client: Galten Municipality

Location: Skovby, Denmark

Established: 1995

Number of basins: 8

Sludge type:Activated sludge

Sludge volume: 185 tonnes DS/year

PE, amount: 12,000

Metz –park of the Seille : collecting and treating stormwater from an adjacent new housing development area inside a 20 ha urban park  and renaturation of the river Seille, flowing along the park.

 

 

Teeside: A 1000 m2, 3 stage passive vertical flow reed bed system, treating run off from an international airport fire fighting training facility.

French VF+ HF + FWS treatment plant for treating the wastewater produced by the winery